Business Highlights / Upper Leacock Township, Lancaster County, Pennsylvania

Business highlight: Eurofins grows its Lancaster laboratory campus

Eurofins’ 300,000-square-foot expansion shows why specialized laboratory space is planned around testing workflows, ventilation, utilities and long-term operating costs.

Eurofins Lancaster Laboratories is expanding its Upper Leacock Township campus for biopharmaceutical testing. Pennsylvania announced a $147.5 million investment and a planned 300,000-square-foot laboratory and office addition at 2425 New Holland Pike in December 2025. [2]

The company's Spring 2026 newsletter says construction began in the second quarter of 2026 and describes the project as its 21st and largest building addition in Lancaster, with completion planned for 2027. [1] Those are company-reported milestones; the sources do not establish that the new building is finished today.

More than a large building

Eurofins began in Lancaster in 1961 and now performs analytical testing for the biopharmaceutical sector, among other services. [2][3] Its own newsletter describes testing customized work for many clients and the need to plan automation around laboratory workflows. [1]

That is the interesting real estate lesson. A 300,000-square-foot number tells readers the scale, but it cannot explain whether the space works. A laboratory also has to organize people, samples, instruments, records, storage and supporting systems so each process can run reliably. The particular design of Eurofins’ new addition is not disclosed in the cited sources.

For a smaller Lancaster medical, food-testing or technical business evaluating a property, the right questions come before a floor plan is final:

  • Which activities need separate rooms or controlled conditions?
  • How will specimens or materials arrive, move through the work and leave?
  • What power, heating, cooling, ventilation, water and backup systems must be specified by engineers?
  • Where can instruments be serviced without interrupting the workflow?
  • What area is needed for staff, records, storage and future changes?

These are planning prompts, not a claim that every lab has the same technical requirements.

Operating cost belongs in the design conversation

Eurofins’ Spring newsletter says its expansion planning considers energy efficiency, water conservation and campus infrastructure. It describes existing measures including lighting upgrades, water-saving fixtures and heat recovery from exhaust at the Lancaster site. [1] The source does not say every measure will be installed in the new addition.

This is a practical reminder for owner-occupants: a specialty building's cost is more than construction dollars. Utility demand, maintenance access, equipment uptime and replacement plans can affect the total occupancy budget for years. Ask the design and operations teams to compare these costs before selecting a building or committing to major renovations.

Keep announced jobs separate from completed jobs

At the December 2025 announcement, Pennsylvania described a plan to create 250 jobs over three years and retain 3,080 positions. [2] WITF independently reported the announcement and noted that a specific project timeline had not then been provided. [3] The company's later newsletter supplies a construction-start quarter and intended completion year, but the employment figures remain commitments rather than a count of positions already added. [1][2]

Eurofins is a positive Lancaster example of a business putting major physical capacity behind specialized services. For other companies, the transferable idea is to connect building size with workflow, systems and operating costs—then use dated, primary project information to distinguish a plan from a completed facility.

Sources & further reading

How does this affect your property?

Bring your questions about buying, leasing or owning commercial space.

Find business space · Sell or lease a property · Industrial and flex space

Talk with Zach