Local market / Hanover, York County, Pennsylvania

Gerard Daniel’s Hanover expansion starts with power and equipment

A $2.1 million manufacturing expansion shows why transformer capacity, equipment needs and production flow should be tested before an industrial user decides to move or grow in place.

Gerard Daniel Worldwide’s announced $2.1 million expansion in Hanover is a useful reminder for manufacturers across south-central Pennsylvania: an expansion plan does not always begin with more square feet. Sometimes it begins with the electrical service, production equipment and internal flow of the building already in use.

Pennsylvania announced the York County project in August 2026. The plan calls for upgrades at Gerard Daniel’s 150 Factory Street operation, including a new electrical transformer and manufacturing equipment. The state said the investment is expected to create 35 jobs and retain 107 positions over five years. The project also received a $200,000 Pennsylvania First Program grant. [1][2]

Gerard Daniel identifies Hanover as its headquarters and a U.S. manufacturing location. The company makes wire cloth, screening products and related components for industries that include food processing, mining, energy, pharmaceuticals and aerospace. [3]

Why the transformer matters

A transformer may sound like a utility detail. For a manufacturer, it can be part of the real estate strategy.

New production equipment can change a facility’s electrical demand, voltage requirements, heat load, compressed-air needs and maintenance access. A building may have adequate floor area yet still be unable to support the next production line without major infrastructure work.

That creates a better first question than “How much space do we need?”

The stronger question is: “What must this operation be able to do in three to five years, and can this property support it?”

A practical expansion test

Before deciding to move, add on or reconfigure, an industrial user should build one operating plan and one property plan.

The operating plan should identify:

  1. Each major piece of proposed equipment.
  2. Connected load, peak demand and required voltage.
  3. Cooling, ventilation, gas, water and compressed-air needs.
  4. Product flow from receiving through production and shipping.
  5. Clearances for installation, service and eventual replacement.
  6. The expected timing of each production phase.

The property plan should then test:

  1. Existing electrical service and transformer capacity.
  2. Utility lead times and whether upstream work may be required.
  3. Roof, slab and structural limits.
  4. Dock, drive-in and truck-circulation capacity.
  5. Fire protection and code implications.
  6. Available space for staging, waste handling and maintenance.
  7. Zoning and approvals for the proposed use and equipment.

A utility bill or panel label is not enough evidence of available capacity. The owner and user should coordinate with the serving utility and qualified engineers before treating additional power as committed.

Improve the building or move?

An existing facility can have advantages that are easy to underestimate: a trained workforce, established shipping patterns, installed processes and familiarity with local approvals. Upgrading it may avoid the disruption of a relocation.

But staying is not automatically cheaper. Transformer work, long-lead equipment, structural changes and temporary production interruptions can turn a modest renovation into a critical-path project.

A useful comparison should include more than rent or acquisition price. It should compare:

  1. Total improvement and equipment cost.
  2. Time until the added capacity can operate.
  3. Lost production or double-occupancy cost during the change.
  4. Workforce and logistics effects.
  5. Expansion capacity after the current project is complete.
  6. The cost and flexibility of the real estate commitment.

The local takeaway

Gerard Daniel’s plan shows why industrial real estate decisions should begin with the process, not the listing sheet. A building can be large enough and still be operationally undersized. It can also look dated and still be the best platform for growth if its location, workforce and infrastructure can be upgraded efficiently.

For Lancaster County manufacturers considering a move, renewal or expansion, document the equipment plan early. That gives the utility, engineer, contractor, owner and real estate team a common set of facts—and reduces the risk of learning too late that the most important part of the deal was outside the four walls.

Sources

[1] Pennsylvania Department of Community and Economic Development, “Creating Jobs in York County: Governor Shapiro Secures $2.1 Million Investment from Gerard Daniel Worldwide,” August 26, 2026. https://dced.pa.gov/newsroom/creating-jobs-in-york-county-governor-shapiro-secures-2-1-million-investment-from-gerard-daniel-worldwide-to-expand-manufacturing-operations-creating-35-new-jobs/

[2] Pennsylvania Business Report, “Gerard Daniel Worldwide expanding in York County,” August 28, 2026. https://pennbizreport.com/news/33426-gerard-daniel-worldwide-expanding-in-york-county/

[3] Gerard Daniel Worldwide, “Locations,” accessed October 13, 2026. https://www.gerarddaniel.com/locations/

[4] Hanover Evening Sun via AOL, “Hanover manufacturer nets state grant for $2.1 million expansion,” August 27, 2026. https://www.aol.com/articles/hanover-manufacturer-nets-state-grant-162526000.html

Sources & further reading

How does this affect your property?

Bring your questions about buying, leasing or owning commercial space.

Find business space · Sell or lease a property · Industrial and flex space

Talk with Zach